Imperative Energy Limited has successfully tendered and won the contracts to provide a biomass heating solution for Hanbridge Campus and Ellesmere Campus in Cheshire.
The contract is for the supply, installation and commission of 1ΓΆβ??β?? 240kW UTSK biomass boiler at Hanbridge and 1 no. 550kW UTSK Biomass Boiler at Ellesmere Campus.
The project is underway and installation will occur during Q4 2010.
Enjoy this article? Share it with others.